Ads-tec BPC1000 Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
Industrial PCs BPC1000
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
15
4.3 OPERATIONAL READINESS CHECK
Connect the power cable to the power source.
Check the device to determine whether damages have been caused by improper
transport, incorrect operation or storage conditions or improper handling (e.g.
smoke emission from the device, etc.). If damages are found, immediately shut
down the device and protect it against unintentional startup.
4.4 PLC SWITCH
The PLC switch is located underneath the cover at the front of the device.
The PLC software can be controlled by using the PLC switch. The function of individual
switch positions may vary depending on the software and PLC version used. Additionally,
you can read current status information by using the keys.
EXAMPLE:
SWITCH POSITION DESCRIPTION
RUN / PROG: Run or programming status
STOP:
PLC is stopped
MRESET:
The PLC is reset
4.5 STATUS DISPLAYS
SYS LED (BICOLOURED)
Depending on the colour and type of flashing different device states are displayed by the
SYS LED.
The following signals are displayed:
LED lights green The device is ready for operation (Power ON).
LED flashes red Environmental temperature too high.
LED is off The device is switched off. (POWER OFF)
4.6 PLC LED (TWO COLORS)
This LED indicates the status of a soft PLC. A soft PLC has to be installed in order for this
LED to display various signals. Various device statuses are indicated by the colors and
flashing patterns of the PLC LED.
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 23 24

Comentarios a estos manuales

Sin comentarios